The Central Digital Platform and your bid readiness
Since April 2026 a below-threshold award means registering and holding a unique identifier. The underlying problem is older: your own facts live in fifteen places.
The Central Digital Platform is the supplier information service behind the Procurement Act 2023, reached through the enhanced Find a Tender service that launched in February 2025. From 1 April 2026 a supplier awarded a notifiable below-threshold contract must be registered on it and hold a unique identifier, which appears in the contract details notice. The thresholds are £12,000 for central government and £30,000 for sub-central, which puts most small works squarely inside it.
Registration itself is not difficult and it is a one-off. What it exposes is the older problem underneath: for most SME contractors, the facts a buyer asks for are not held anywhere in particular. Turnover by year, net assets, insurance limits and expiry dates, accreditations, trades self-delivered, regions worked, the industries actually delivered in, concurrent project capacity — each of them exists, in a folder, in an accountant’s email, on a certificate somebody photographed. They get re-typed into every portal, and they drift.
Why that costs real work
Because it is re-typed under deadline. A pre-qualification questionnaire filled in at eleven at night from last year’s answers is how a firm declares an insurance limit that expired in March, or a turnover figure that no longer matches the filed accounts. Neither is dishonest. Both are disqualifying.
A maintained record, not a folder
CONSTRUX holds the company’s own verified facts once, as a record with a version on it, and sets a buyer’s requirements against them rather than against a memory of them. A compliance matrix is produced from a confirmed reading of the invitation, line by line, with the source document and clause against each requirement — so an answer can be traced back to what was actually asked rather than to what somebody thought was asked. The reading, its confirmation and every change to it are events in the golden thread.
And the deliverables register holds what has to go back: every item, whether it is mandatory, its page limit, its format, who owns it and the internal date it is due. A mandatory deliverable with no owner and no internal date is how a correctly priced bid gets disqualified, and it is the most avoidable loss in the industry.
See the record being made rather than described.
Launch the demo environment